Home ProductsDWC Pipe Extrusion Line

SBG 600H High Speed HDPE Cable Covering Corrugated Pipe Extrusion Line

SBG 600H High Speed HDPE Cable Covering Corrugated Pipe Extrusion Line

SBG 600H High Speed HDPE Cable Covering Corrugated Pipe Extrusion Line
SBG 600H High Speed HDPE Cable Covering Corrugated Pipe Extrusion Line
SBG 600H High Speed HDPE Cable Covering Corrugated Pipe Extrusion Line
Product Details:
Place of Origin: CHINA
Brand Name: Shandong Huasu Brand
Certification: CE, ISO9001
Model Number: DWC Pipe Extrusion Pruduction Line
Payment & Shipping Terms:
Minimum Order Quantity: 1 SET
Price: US $10,200-390,000/ Set
Packaging Details: standard package or as required
Delivery Time: 30 working days
Payment Terms: T/T
Supply Ability: 5 sets/month
Contact Now
Detailed Product Description
Model NO.: SGB600H Screw Model: SJ 120/33 & SJ 90/33
Power: 220kw & 132kw Output: 800kg & 450kg
High Light:

SBG 600H Corrugated Pipe Extrusion Line

,

HDPE Corrugated Pipe Extrusion Line

,

SBG 600H Corrugated Pipe Machine

SBG 600H High Speed HDPE Cable Covering Corrugated Pipe Extrusion Line

Introduction of HDPE Cable Covering Corrugated Pipe Extrusion Line

The company's newly developed PE double wall corrugated pipe equipment, on the basis of fully absorbing foreign advanced technology, independently developed PE double wall corrugated pipe production line, has a number of patent technologies, the production pipe diameter range is 63mm-1200mm
The production line has the characteristics of high degree of automation, stable operation, high efficiency, simple maintenance and convenient operation.

A new type of high efficiency single screw extruder is adopted with large amount of extrusion. The forming machine adopts horizontal structure, sealed water-cooling, vacuum forming, on-line double-layer flaring, on-line extrusion die and forming machine three-dimensional calibration technology, which is very convenient for users to change the module and cause adjustment difficulties

The advanced module running track design reduces the module running resistance to the minimum.

The wear between the modules and between the module base and the upper and lower frames is the lowest of the same kind of equipment.

Module quick disassembly and assembly system, through the hydraulic workstation, can realize the rapid replacement of modules of different specifications.

Forced water cooling and air cooling combined module cooling technology not only simplify the cooling structure of the module, but also ensures the cooling efficiency of the module and brings higher production efficiency.

Photo of HDPE Cable Covering Corrugated Pipe Extrusion Line

SBG 600H High Speed HDPE Cable Covering Corrugated Pipe Extrusion Line 0

Contact Details
Qingdao Huasu Machinery Fabrication Co,. Ltd.

Contact Person: Xiaoyan

Tel: +8613864817239

Send your inquiry directly to us (0 / 3000)

Contact

Address: No. 8 Haier Road, Jiaozhou Bay industry Zone, Qingdao Jiaozhou City, P. R. China

Factory Address:No. 8 Haier Road, Jiaozhou Bay industry Zone, Qingdao Jiaozhou City, P. R. China