Place of Origin:
CHINA
Brand Name:
Shandong Huasu Brand
Certification:
CE, ISO9001
Model Number:
DWC Pipe Extrusion Pruduction Line
In order to produce Corrugated Pipes, at first the raw material are melted at high temperature in extruder at extrusion process. In this step, the temperature control is very important because in different temperatures product and polyethylene type will be different. The resulting polyethylene then passes through a chamber to form a tube. The process of creating loops in the outer surface of the tube (tubes corrugation), is carried out by vacuum and using rotating continuous molds. Temperature control and setting is also important in this step. Water nozzels are located at the end of corrugated pipe production line to cool the output product. The product quality control steps are carried out at the factory lab.
For other parts, please check with Ellen Liu.
![]()
![]()
Send your inquiry directly to us
Overall Rating
Rating Snapshot
The following is the distribution of all ratingsAll Reviews