Place of Origin: | CHINA |
Brand Name: | Shandong Huasu Brand |
Certification: | CE, ISO9001 |
Model Number: | DWC Pipe Extrusion Pruduction Line |
Minimum Order Quantity: | 1 SET |
---|---|
Price: | $10,000.00 - $180,000.00/ Set |
Packaging Details: | standard package or as required |
Delivery Time: | 30 working days |
Payment Terms: | T/T |
Supply Ability: | 5 sets/month |
Material: | PE PP Pellets | Origin: | China |
---|---|---|---|
Price: | Competitive | Delivery Time: | 45 Working Days |
High Light: | DWC Pipe Extrusion Machinery,Double Wall Pipe Extrusion Machinery,Double Wall Corrugate Pipes Making Machine |
- The extruders in the production line of double wall polyethylene pipes shall be of credible and well known brands.
- Brand and quality of all equipment in the production line shall be of credible and certified brands and each one shall have catalogue and valid documents for presentation.
- The production line shall be equipped with modern and automatic control systems while production which would reduce the occurrence of any fault down to zero while producing the pipes.
- The extruders and other instruments in the production line shall be newly produced.
- Make sure of the marking on the polyethylene pipes and of its conformity with the standards.
- Storing, maintenance and transportation shall be in accordance with the standards.
- The factories shall be located within well-known industrial complexes with unlimited access to the freeways of the country.
- The factory environment and workplace shall be in good order and free of excessive elements.
- The raw materials shall be kept in the shadow and away from moisture.
- The raw material shall be injected into the extruders via silos.
- The cooling system of polyethylene pipes shall be standard and up to date.
- Side systems of production line (pool, electricity, compressors, etc.)
- The system and procedure of controlling the dimension of polyethylene pipes during and after production of double wall corrugate poly ethylene pipes
- Quality control and laboratory unit
- The storage location of polyethylene pipes shall have a smooth surface.
- The conveying and loading method of polyethylene pipes shall be examined and in conformity with the instructions.
Photo of Double Wall Corrugate Pipes Making Machine
Contact Person: Xiaoyan
Tel: +8613864817239
Address: No. 8 Haier Road, Jiaozhou Bay industry Zone, Qingdao Jiaozhou City, P. R. China
Factory Address:No. 8 Haier Road, Jiaozhou Bay industry Zone, Qingdao Jiaozhou City, P. R. China